Boston MBTA AVI Cases

Completed in 2015
MBTA (Massachusetts Bay Transportation Authority) / RL Controls
Factory wiring and assembly of 28 AVI (Automatic Vehicle Identification) cases with Hanning & Kahl TWC Interrogators.
Completed in 2015
Factory wiring and assembly of 28 AVI (Automatic Vehicle Identification) cases with Hanning & Kahl TWC Interrogators.
Completed in 2015
Factory engraving, wiring and assembly of route selector panels for OMSI and OPRR (Oregon Pacific Railroad) locations.
Completed in 2014
Factory wiring and assembly of 2 signal houses, 1 signal case, 2 switch heater cases and 1 crossing case with MicroLok controllers, wayside and communication equipment.
Completed in 2014
Factory fabrication, engraving, wiring and assembly of the CN Manchac Drawbridge control panel.
Completed in 2014
Factory wiring and assembly of signal cases, racks and bungalows with Siemens S7 controllers for the new Orange Line extension.
Completed in 2014
Factory wiring and assembly of 1 signal house with MicroLok controller, wayside and communication equipment.
Completed in 2012
On October 4, 2012 a signal case at the Rose Quarter MAX platform was destroyed by a car traveling at 80 mph off the freeway ramp.
2011 - 2013
Factory wiring and assembly of 82 signal enclosures with Siemens S7 processors.
In Progress
Factory wiring and assembly of 9 signal houses and field modifications to 2 signal houses and 1 crossing house.